Shanghai Zhengou 3700 ton anti-corrosion coating construction project EIA secondary publicity
Shanghai Zhengou 3700 ton anti-corrosion coating construction project EIA secondary publicity
April 6, 2012
[China coating information] release unit: Shanghai Environmental Energy Conservation Engineering Co., Ltd. 3 fluorovinyl chloride copolymer can be cured at constant temperature
release date: April 6, 2012
related links: brief version of the EIA report EIA first publicity
1 Description
Shanghai Environmental Energy Conservation Engineering Co., Ltd. is entrusted by Shanghai Zhengou Industrial Co., Ltd. to carry out environmental impact assessment on the production and construction project with an annual output of 3500 tons of polyurea, 3700 tons of anti-corrosion coating and 4million square meters of szo inorganic insulation board. The second information release is now made to the public in accordance with national and municipal laws and regulations
Shanghai Zhengou Industrial Co., Ltd. and Shanghai Environmental Energy Conservation Engineering Co., Ltd. are responsible for the authenticity of the information released at this stage. With the implementation process of the project and the implementation of environmental impact assessment, relevant information will be improved or adjusted
2. Overview of the construction project
(1) project name: production and construction project with an annual output of 3500 tons of polyurea, 3700 tons of anti-corrosion coating and 4million square meters of szo inorganic insulation board
(2) project location: Jinhuan Road, Weizhen Town, Jinshan District, Shanghai, the base is East to Shanghai Xianjia Chemical Co., Ltd., West to Shanghai Lide catalyst Co., Ltd., South to Jinhuan Road, North Xinwei Expressway
(3) industry of the project: c2641 - paint manufacturing, c3135 - heat insulation and sound insulation material manufacturing
(4) project content: this project is a new project. The total area of the project is 37302.39 square meters. The detection accuracy and durability are the first choice. The total construction area of Jinan new era Gold Testing Instrument Co., Ltd. is 17238 square meters. It mainly builds paint workshop, thermal insulation material workshop, water-based coating workshop, comprehensive workshop, warehouse, accident collection tank, pump room, storage tank area, etc. it is estimated that the annual output of 3500 tons of polyurea, 3700 tons of anti-corrosion coating and 4million square meters of szo inorganic thermal insulation plate
(5) conclusion of environmental impact assessment of the project
the construction of the project conforms to the industrial policy guidance of the state and Shanghai, and is compatible with regional planning and environmental functions. The production technology adopted in the project is advanced and meets the requirements of cleaner production. The discharge of pollutants can meet the standard after implementing various treatment measures, and the impact on the surrounding environment can meet the requirements of environmental functional areas
therefore, from the perspective of environmental protection, the construction of this project is feasible
3. Environmental impact assessment document of construction project
(1) simplified report: see the link
(2) review period: 10 working days from the date of information release
4 Contact person and contact information of the evaluation institution
(1) name of the evaluation institution: Shanghai Environmental Energy Conservation Engineering Co., Ltd.
(2) certificate number of the evaluation institution: National Environmental Assessment Certificate B No. 1809
(3) address of the evaluation institution: room 306, No. 236, Guohuo Road, Huangpu District, Shanghai (post code: 200011)
(4) contact person of the evaluation institution: Miss Bai
(5) Contact information of the evaluation organization:
:
e-mail: sety@
5. Scope of soliciting public opinions
opinions and suggestions of residents, enterprises and other affected people in the area on environmental protection of the construction project (issues unrelated to environmental protection are not accepted)
6. Public feedback
(1) feedback method
the public's understanding and opinions on the contents involved in the abridged version of the environmental impact report published this time can be fed back to the construction unit and the environmental assessment unit through published e-mail, fax, letter and other means
(2) feedback time limit
within 10 working days from the issuance of this data processing announcement
7. The valid period of information release is 10 working days from the date of information release
LINK
Copyright © 2011 JIN SHI